Impact & methodology

How each number on this site is calculated.

Most waste contractors publish a tonnage and a carbon figure. Almost none publish the boundary, the period or the factor. That makes the numbers unusable to the one audience that most needs them — the person who has to put them in a sustainability report and stand behind them.

StatedBoundaries
SourcedEmission factors
DatedReporting periods
NamedExclusions

Headline figures

The numbers we publish, and what sits behind each.

Every figure below is group-wide — Earth Recycler’s operations in India and the UAE together, since 2013. Dubai-only figures will be published separately, on the same basis, once a full reporting period has closed.

450+tonnes / day
Managed daily, group-wide
Across all operating contracts, India and the UAE
1.2M+tonnes
Processed since inception
Group-wide, 2013 to date
850K+tonnes
Organic compost produced
Group-wide, from food and garden waste
40+cities
Operating footprint
Dubai, plus 40+ cities in India
FigureDefinitionBasisWhat it excludes
450+ tonnes/dayWaste under active management across all live contracts, group-wideWeighbridge-recorded receipts at processing facilities, averaged across operating daysMaterial collected but rejected at gate for contamination
1.2M+ tonnesCumulative waste processed by the group since 2013Sum of facility receipts, 2013 to dateMaterial handled under subcontract to another principal
850K+ tonnesOrganic compost produced, group-wideFacility output weighed at dispatchCompost that failed characterisation and was re-processed
500+ clientsClients served, active and completed, group-wideCount of distinct clients in the contract registerOne-off event and pilot engagements
Dubai + 40+ citiesDubai, plus cities in India with active group operationsCities with a current contract and a servicing capabilityCities served historically but not currently
90% diversionShare of managed waste diverted from landfill, group-wideRecovered tonnage ÷ total received tonnage, per contract, weightedSee the note directly below — read it before quoting this figure

The number we are least comfortable with

A diversion rate is only meaningful if you say what is in the denominator.

Diversion percentages across this industry are close to useless as a comparison tool, because there is no shared convention on what goes into the calculation. A vendor who measures only the segregated fraction will always beat one who measures everything received, and the second vendor is doing the better job.

Our 90% is a group-wide weighted figure across contracts, calculated on total tonnage received rather than on the segregated fraction. Individual sites sit above and below it, and a site with poor source segregation will sit materially below it — which is a fact about that site, not a failure to be hidden.

What we will not do is quote a diversion figure without the reject fraction alongside it. Every contract produces material that cannot be recovered. Reporting only the good half is how this industry lost the right to be taken at its word. With Dubai working to close its landfills by the end of 2027, the reject fraction is exactly the number clients will be asked about.

Basis of preparation

Six rules we apply to every figure we publish.

01

Boundary before number

No figure is published without stating what is inside and outside it. Where a boundary changes, we restate the prior period rather than quietly re-baselining.

02

Weighbridge over estimate

Tonnage is recorded at physical weighing at point of receipt. Where a figure is necessarily estimated — event waste, for instance — it is labelled as an estimate.

03

Rejects reported alongside recovery

Any diversion or recovery figure is accompanied by the reject fraction. The two are meaningless apart.

04

Factors cited, not implied

Emission factors are named with their source and version. Avoided-emissions figures are reproducible from the published workings.

05

Period stated

Cumulative figures name their start date. Rate figures name their averaging period. "Since inception" means since the group began operating in 2013.

06

Corrections published

Where we find an error we correct it and note the correction rather than silently amending. If you find one, tell us — the offer is genuine.

Assurance

Where we are, and are not, independently verified.

Being straightforward about this is more useful than a badge. Independent assurance is a real cost and a real commitment, and pretending to it is worse than not having it.

Weighing records
Primary records, maintained per contract, available for client and auditor inspection.
Registrations and permits
In Dubai, issued by Dubai Municipality and the Department of Economy and Tourism and verifiable with them. The group’s Indian facilities hold their own regulatory consents.
Management systems
Third-party certified where held — see the credentials dossier for the certifying body and certificate number.
Client-level reporting
Supplied with underlying evidence so a client’s own assurance provider can test it directly.
Company-level impact figures
Not currently subject to independent limited assurance. Few in this category obtain it. We would rather say so than imply otherwise, and we regard closing this gap as a legitimate ask from any large client.

Next step

Found something here that does not add up?

Then we would like to know. A methodology page that nobody is invited to challenge is just a longer marketing page. Send the question to our team and we will either explain the basis properly or correct the figure and note the correction.